CAE has vast experience of executing turnkey projects. We have the resources to take the raw requirement from the client and hand over the completed project. We have the capacity to take care of the project administration, electrical & instrumentation engineering and design, subcontracting, project management, supply and procurement of equipment, construction, installation, pre-commissioning, testing and commissioning, start-up, maintenance and upgrade.
All works can be carried out in Hot Changeover mode and within minimum shutdown periods.
We take the full responsibility for all activities of the contract to be performed on time and in accordance with the project schedule.
|
|
References
|
| RTU/SCADA Replacement
Year: 2007
Location: Umm Shaif, Zakum (Offshore platforms), U.A.E.
Contractor/End User: ADMA-OPCO/ADMA-OPCO |
| Project scope: |
 |
Replacement of existing and associated Radio with the new DNP type RTU at Telemetry Wellhead towers and integration with the new SCADA system |
 |
Installation of the new RTU, with digital radio and solar system and field instrumentation at existing non telemetry tower to interface and integrate with the new SCADA system, installation of SCADA, DCS, Hydraulic Safety Shutdown System, Telemetry Interface module, field instruments and cables |
 |
Site survey and validation |
 |
Basic and detailed engineering |
 |
Procurement of all systems, construction related to FAT and IFAT services |
 |
Pre-commissioning and commissioning |
 |
Hot Changeover |
|
|
| Habshan Non-Process Buildings
Year: 2006
Location: Habshan, U.A.E.
Contractor/End User: Granite / GASCO
Project scope: |
 |
Complete electrical and instrumentation works for the non-process buildings, including supply of of all the products for fire detection system, telephone system, data network system, lighting & power (internal, external), UPS system for switchgear, transformer, LV switchgear, explosion proof light fitting, isolators in lab area |
|