Ruwais 4th NGL Train Instrumentation Works
Year: 2010
Location: Ruwais, Abu Dhabi, U.A.E.
Contractor/End User: Petrofac - GS Engineering Construction/GASCO |
|
Project scope:
- Instrumentation & Telecom works including tie-in works
- Cathodic Protection works, as required
- Instrumentation hook-ups
- Testing & Pre-Commissioning
- Assistance during Commissioning and Performance Testing
- Supply & Installation of all materials
- Temporary construction works
|
|
|
|
RTU/SCADA Replacement
Year: 2007
Location: Umm Shaif, Zakum(Offshore Platforms), U.A.E.
Contractor/End User: ADMA-OPCO |
|
Project scope:
- Engineering, Procurement, Construction & Commissioning
- Instrumentation, Electrical and Mechanical works
- Hot Changeover
- DCS upgrade, RTU / SCADA / Hydraulic safety shutdown system replacement
- Solar panels, Telemetry interface
- Cabling
|
|
| Back to Top |
|
|
|
Modernization of SCADA & Instruments/Control Systems (MOSAICS)
Year: 2007
Location: Zirku Island, U.A.E.
Contractor/End User: Honeywell / ZADCO |
|
Project scope:
- Electrical, Instrumentation & Civil works
- Hot Changeover
- SCADA, ESD, F&G, DCS upgrade
|
|
|
| Back to Top |
|
|
Asab Accommodation Facilities
Year: 2007
Location: Asab, Abu Dhabi, U.A.E.
Contractor/End User: Granite / GASCO |
|
Project scope:
- Design, Engineering, Procurement, Construction, Installation & Commissioning of:
- Electrical Distribution Network
- SMATV system
- Voice & Data Networks
- 11 KV substations, LV power distribution, Internal and External Electrification
- Structured cabling system
|
|
|
| Back to Top |
|
|
Formula 1 Race Track
Year: 2008
Location: Yas Island, Abu Dhabi, U.A.E.
Contractor/End User: PKE Siemens/ALDAR |
|
Project scope:
- Engineering, Procurement & Construction works for all buildings
- Installation of complete systems:
- Lighting, small power, earthing
- Lightning protection
- Fire alarm systems
- Structured cabling for all systems
|
|
|
| Back to Top |
|
|
Habshan Non-Process Buildings
Year: 2006
Location: Habshan, U.A.E.
Contractor/End User: Granite/GASCO |
|
Project scope:
- Engineering, Procurement, Construction & Commissioning
- 11 KV substations, LV power distribution, Internal and external Electrification
- Structured cabling system
- Fire Alarm and Gas detection system
- Public Address System
- PABX and related works
|
|
|
| Back to Top |
|
|
Desalination Plant Electrical Works
Year: 2008
Location: Fujairah, U.A.E.
Contractor/End User: OTV-Veolia/Fujairah Asia Power Company |
|
Project scope:
- Electrical works and Instrumentation Engineering works including detail design & supply for Reverse Osmosis plant
- Supply and Installation of the following:
- Electrical Sleeves
- Steel Structures
- Fire Fighting Works
- Complete Lightning Systems for various buildings
- Building Lighting and Small Power Works
|
|
|
| Back to Top |
|
|
Ruwais Refinery Expansion - Utilities and Offside Unit E&I Works
Year: 2010
Location: Ruwais, Abu Dhabi, U.A.E.
Contractor/End User: Samsung / TAKREER |
|
Project scope:
- Electrical, Instrumentation Works
- Testing & Pre-Commissioning
- Assistance during Commissioning and Performance Testing
- Supply & Installation of all materials
- Temporary construction works
|
|
|
| Back to Top |
|
|
AGD II Construction Camp & Temporary Facilities
Year: 2006
Location: Asab, Abu Dhabi, U.A.E.
Contractor/End User: Granite / Bechtel |
|
Project scope:
- Electrical, Instrumentation works
- Cabling
- Power Supply
- Fire alarm
- SMATC systems
|
|
|
| Back to Top |
|
|
Step I Ethylene Plant
Year: 2001
Location: Ruwais, Abu Dhabi, U.A.E.
Contractor/End User: Alstom/Borouge |
|
Project scope:
- Construction
- Commissioning
- Public Address System
- Fiber Optic Cables
- Security System, CCTV
- Telephone, Data System
|
|
|
| Back to Top |
|
|
Safety Integrity Level Study for Train I, II, III and Boilers 1-6 ESD Systems
Year: 2008
Location: Das Island, U.A.E.
Contractor/End User: ADGAS |
|
Project scope:
- Safety Integrity Level (SIL) study and Procurement works
- Validation of FEED documents
- Assessment of existing safety related instrumentation, including site survey and field verification
- Determination of risk reduction requirements for each Safety Instrumented Function (SIF)
- Field instruments installation and support
|
|
|
| Back to Top |
|
|
Al Wathba Waste Water Treatment Plant
Year: 2010
Location: Al Wathba, Abu Dhabi, U.A.E.
Contractor/End User: OTV-BESIX Sanotec JV / ADWEA |
|
Project scope:
- Electrical & Instrumentation Works
- Testing & Pre-Commissioning
- Assistance during Commissioning and Performance Testing
- Supply & Installation of all materials
- Temporary construction works
|
|
|
| Back to Top |
|
|
SAS Fields E&I and Telecom Works
Year: 2010
Location: Sahil/Asab/Shah Fields, Abu Dhabi, U.A.E.
Contractor/End User: Tekfen / ADCO |
|
Project scope:
- Electrical, Instrumentation & Telecom works (Control Room/Substation and Field)
- Transformers, Switchgears, VSDs, DBs, Multiport Selection Valves, DG sets
- F&G, Alarm Systems
- Loss prevention works, loop checking, cathodic protection works, calibration of instruments
- Assistance during valve retrofitting, Electrical, Instrumentation and Telecom Tie-ins
|
|
|
| Back to Top |
|
|
Ruwais Refinery Expansion - Tankage and Piping Unit Instrumentation Works
Year: 2010
Location: Ruwais, Abu Dhabi, U.A.E.
Contractor/End User: Daewoo / TAKREER |
|
Project scope:
- Installation of Instrumentation Works & its related items
- Testing & Pre-Commissioning
- Assistance during Commissioning and Performance Testing
- Supply & Installation of all materials
- Temporary construction works
|
|
|
| Back to Top |
|
|
Allahamah Waste Water Treatment Plant
Year: 2010
Location: Allahamah, Al Ain, Abu Dhabi, U.A.E.
Contractor/End User: OTV - Besix Sanotec JV / ADWEA |
|
Project scope:
- Electrical & Instrumentation Works
- Testing & Pre-Commissioning
- Assistance during Commissioning and Performance Testing
- Supply & Installation of all materials
- Temporary construction works
|
|
|
| Back to Top |
|
|
BeAAT Central Environment Protection Facilities
Year: 2006
Location: Ruwais, Abu Dhabi, U.A.E.
Contractor/End User: SNC Lavalin / TAKREER |
|
|
Project scope:
- Procurement, Construction, Commissioning
- Total Plant Electrical works including 11 KV substation, Power distribution, Lighting, Earthing, feed to process loads
- Total Plant Instrumentation works including control room equipments such as PLC, Fire & Gas system, PA system etc.
- Complete field instrumentation, cabling, hook ups and commissioning
|
| Back to Top |
|
|
|
Boilers Control System Upgrade
Year: 2006
Location: Das Island, Abu Dhabi, U.A.E.
Contractor/End User: ADMA-OPCO |
|
Project scope:
- Engineering, Procurement, Construction & Commissioning
- Electrical, Instrumentation & Civil works
- Changeover of control system during shutdown
- Control System, PLC, BMS
- Cabling works
|
|
|
| Back to Top |
|
|
Water Injection System Upgrade
Year: 2005
Location: Asab, Abu Dhabi, U.A.E.
Contractor/End User: CAT / ADCO |
|
Project scope:
- Engineering, Procurement, Construction
- Electrical & Instrumentation
- SCADA
- Controls systems
- Power supply
- Cabling works
|
|
|
| Back to Top |
|
|
Habshan Industrial Facilities
Year: 2010
Location: Habshan, Abu Dhabi, U.A.E.
Contractor/End User: Al Fara’a / GASCO |
|
Project scope:
- Complete MEP works (Design, Detailed Engineering, Testing, Installation & Commissioning)
- Electrical works
- Telecom System for all the buildings
- Voice & Data, PA, CCTV, Access Control System
- HVAC
- Plumbing & Drainage
- Fire Fighting works
|
|
|
| Back to Top |
|
|
|
|