Reference Projects

Das Island

EPC for ADGAS Switchgear Upgrade Project

  • Year: 2014-2017
  • Location: Das Island, U.A.E.
  • End User: ADGAS
  • Project Scope:
    • Engineering, procurement & construction
    • 33kV, 11kV & 0.415kV LV switchgear and transformer
    • Modification of 33kV panel
    • 33kV, 11kV & LV cable laying and termination
    • 11kV RMU
    • DC/AC UPS
    • PMS/LMS system
    • Temporary power supply arrangement during changeover period
    • DCS Systems, ESD systems, F&G system, Telecom systems
Dabbiya and Rumaitha Field

Replacement of Obsolete 11kV Switchgears

  • Year: 2014-2015
  • Location: Dabb’iya & Rumaitha Fields, U.A.E.
  • End User: ADCO
  • Project Scope:
    • Engineering, procurement, construction & commissioning
    • Supply & installation of new 11kV switchgear
    • Relay coordination study
    • Cable tray & conduit works
    • Modifications to existing EDSS, DCS
    • Cable jointing & MV cable termination
    • Pre-commissioning, commissioning, training & handover
Offshore Oil Platform at Zakum oilfield

RTU on HP NTLM Towers – ADMA-OPCO

  • Year: 2012
  • Location: Umm Shaif, Zakum Field, U.A.E.
  • End User: ADMA-OPCO
  • Project Scope:
    • Engineering, procurement, construction & commissioning
    • Instrumentation, electrical and piping modification works
    • Provision of new hydraulic shutdown system and TIM
    • Solar panels
    • Structural deck extensions
    • ESD console upgrade
    • Cabling and termination works
Offshore Oil Platform at Zakum oilfield

Replacement of 415V Switchgear (USSC)

  • Year: 2011
  • Location: Umm Shaif, Zakum Field, U.A.E.
  • End User: ADMA-OPCO
  • Project Scope:
    • Engineering, procurement, construction & commissioning
    • Power system study
    • Engineering to match footprints
    • Procurement and installation using temp boards
    • Hot Changeover to new panels
    • Procurement and installation of two 100 VDC UPS
    • Commissioning of UPS
Electrical Works Ruwais NGL

Ruwais 4th NGL Train Instrumentation Works

  • Year: 2010
  • Location: Ruwais, Abu Dhabi, U.A.E.
  • Contractor/End User: Petrofac – GS Engineering Construction / GASCO
  • Project Scope:
    • Instrumentation and telecom works including tie-in works
    • Cathodic protection works, as required
    • Instrumentation hook-ups
    • Testing and pre-commissioning
    • Assistance during commissioning and performance testing
    • Supply and installation of all materials
    • Temporary construction works
Offshore Oil Platform at Zakum oilfield

RTU/SCADA Replacement

  • Year: 2007
  • Location: Umm Shaif, Zakum Field, U.A.E.
  • Contractor/End User: ADMA-OPCO
  • Project Scope:
    • Engineering, procurement, construction & commissioning
    • Instrumentation, electrical and mechanical works
    • Hot changeover
    • DCS upgrade, RTU / SCADA / hydraulic safety shutdown system replacement
    • Solar panels, telemetry interface
    • Cabling
Modernization of SCADA & Instruments/Control Systems

Modernization of SCADA & Instruments/Control Systems (MOSAICS)

  • Year: 2007
  • Location: Zirku Island, U.A.E.
  • Contractor/End User: Honeywell / ZADCO
  • Project Scope:
    • Electrical, instrumentation & civil works
    • Hot changeover
    • SCADA, ESD, F&G, DCS upgrade
Asab Accommodation Facilities

Asab Accommodation Facilities

  • Year: 2007
  • Location: Asab, Abu Dhabi, U.A.E.
  • Contractor/End User: Granite / GASCO
  • Project Scope:
    • Design, Engineering, Procurement, Construction, Installation & Commissioning of:
      • Electrical distribution network
      • SMATV system
      • Voice & data networks
    • 11 KV substations, LV power distribution, internal and external electrification
    • Structured cabling system
Yas Marina Circuit

Formula 1 Race Track

  • Year: 2008
  • Location: Yas Island, Abu Dhabi, U.A.E.
  • Contractor/End User: PKE – Siemens / ALDAR
  • Project Scope:
    • Engineering, procurement & construction works for all buildings
    • Installation of complete systems:
      • Lighting, small power, earthing
      • Lightning protection
      • Fire alarm systems
      • Structured cabling for all systems
Habshan Non-Process Buildings

Habshan Non-Process Buildings

  • Year: 2006
  • Location: Habshan, Abu Dhabi, U.A.E.
  • Contractor/End User: Granite / GASCO
  • Project Scope:
    • Engineering, procurement, construction & commissioning
    • 11 KV substations, LV power distribution, internal and external electrification
    • Structured cabling system
    • Fire alarm and gas detection system
    • Public address system
    • PABX and related works
Fujairah Desalination Plant

Desalination Plant Electrical Works

  • Year: 2008
  • Location: Fujairah, U.A.E.
  • Contractor/End User: OTV – Veolia / Fujairah Asia Power Company
  • Project Scope:
    • Electrical works and instrumentation engineering works including detail design & supply for reverse osmosis plant
    • Supply and Installation of the following:
      • Electrical sleeves
      • Steel structures
      • Fire fighting Works
      • Complete lightning systems for various buildings
      • Building lighting and small power works
Ruwais Refinery

Ruwais Refinery Expansion – Utilities and Offside Unit E&I Works

  • Year: 2010
  • Location: Ruwais, Abu Dhabi, U.A.E.
  • Contractor/End User: Samsung / TAKREER
  • Project Scope:
    • Electrical, instrumentation works
    • Testing and pre-commissioning
    • Assistance during commissioning and performance testing
    • Supply and installation of all materials
    • Temporary construction works
AGD II Construction Camp & Temporary Facilities

AGD II Construction Camp & Temporary Facilities

  • Year: 2006
  • Location: Asab, Abu Dhabi, U.A.E.
  • Contractor/End User: Granite / Bechtel
  • Project Scope:
    • Electrical, instrumentation works
    • Cabling
    • Power supply
    • Fire alarm
    • SMATC systems
Step I Ethylene Plant

Step I Ethylene Plant

  • Year: 2001
  • Location: Ruwais, Abu Dhabi, U.A.E.
  • Contractor/End User: Alstom / Borouge
  • Project Scope:
    • Construction
    • Commissioning
    • Public address system
    • Fiber optic cables
    • Security system, CCTV
    • Telephone, data system
Safety Integrity Level Study for Train I, II, III and Boilers 1-6 ESD Systems

Safety Integrity Level Study for Train I, II, III & Boilers 1-6 ESD Systems

  • Year: 2008
  • Location: Das Island, U.A.E.
  • Contractor/End User: ADGAS
  • Project Scope:
    • Safety Integrity Level (SIL) study and procurement works
    • Validation of FEED documents
    • Assessment of existing safety related instrumentation, including site survey and field verification
    • Determination of risk reduction requirements for each Safety Instrumented Function (SIF)
    • Field instruments installation and support
Al Wathba Waste Water Treatment Plant

Al Wathba Waste Water Treatment Plant

  • Year: 2010
  • Location: Al Wathba, Abu Dhabi, U.A.E.
  • Contractor/End User: OTV – BESIX Sanotec JV / ADWEA
  • Project Scope:
    • Electrical & Instrumentation Works
    • Testing & Pre-Commissioning
    • Assistance during Commissioning and Performance Testing
    • Supply & Installation of all materials
    • Temporary construction works
Instrumentationa And Control

SAS Fields E&I and Telecom Works

  • Year: 2010
  • Location: Sahil/Asab/Shah Fields, Abu Dhabi, U.A.E.
  • Contractor/End User: Tekfen / ADCO
  • Project Scope:
    • Electrical, Instrumentation & Telecom works (Control Room/Substation and Field)
    • Transformers, Switchgears, VSDs, DBs, Multiport Selection Valves, DG sets
    • F&G, Alarm Systems
    • Loss prevention works, loop checking, cathodic protection works, calibration of instruments
    • Assistance during valve retrofitting, Electrical, Instrumentation and Telecom Tie-ins
Ruwais Refinery

Ruwais Refinery Expansion – Tankage and Piping Unit Instrumentation Works

  • Year: 2010
  • Location: Ruwais, Abu Dhabi, U.A.E.
  • Contractor/End User: Daewoo / TAKREER
  • Project Scope:
    • Installation of Instrumentation Works & its related items
    • Testing & Pre-Commissioning
    • Assistance during Commissioning and Performance Testing
    • Supply & Installation of all materials
    • Temporary construction works
Allahamah Waste Water Treatment Plant

Allahamah Waste Water Treatment Plant

  • Year: 2010
  • Location: Allahamah, Al Ain, Abu Dhabi, U.A.E.
  • Contractor/End User: OTV – Besix Sanotec JV / ADWEA
  • Project Scope:
    • Electrical & Instrumentation Works
    • Testing & Pre-Commissioning
    • Assistance during Commissioning and Performance Testing
    • Supply & Installation of all materials
    • Temporary construction works
BeAAT Central Environment Protection Facilities

BeAAT Central Environment Protection Facilities

  • Year: 2006
  • Location: Ruwais, Abu Dhabi, U.A.E.
  • Contractor/End User: SNC Lavalin / TAKREER
  • Project Scope:
    • Procurement, Construction, Commissioning
    • Total Plant Electrical works including 11 KV substation, Power distribution, Lighting, Earthing, feed to process loads
    • Total Plant Instrumentation works including control room equipments such as PLC, Fire & Gas system, PA system etc.
    • Complete field instrumentation, cabling, hook ups and commissioning
Boilers Control System Upgrade

Boilers Control System Upgrade

  • Year: 2006
  • Location: Das Island, Abu Dhabi, U.A.E.
  • Contractor/End User: ADMA-OPCO
  • Project Scope:
    • Engineering, Procurement, Construction & Commissioning
    • Electrical, Instrumentation & Civil works
    • Changeover of control system during shutdown
    • Control System, PLC, BMS
    • Cabling works
Water Injection System Upgrade

Water Injection System Upgrade

  • Year: 2005
  • Location: Asab, Abu Dhabi, U.A.E.
  • Contractor/End User: CAT / ADCO
  • Project Scope:
    • Engineering, Procurement, Construction
    • Electrical & Instrumentation
    • SCADA
    • Controls systems
    • Power supply
    • Cabling works
Habshan Industrial Facilities

Habshan Industrial Facilities

  • Year: 2010
  • Location: Habshan, Abu Dhabi, U.A.E.
  • Contractor/End User: Al Fara’a / GASCO
  • Project Scope:
    • Complete MEP works (Design, Detailed Engineering, Testing, Installation & Commissioning)
    • Electrical works
    • Telecom System for all the buildings
      • Voice & Data, PA, CCTV, Access Control System
    • HVAC
    • Plumbing & Drainage
    • Fire Fighting works
Khalifa Port Special System Project

Khalifa Port Special System Project

  • Year: 2011
  • Location: Taweelah, Abu Dhabi, U.A.E.
  • Contractor/End User: Page Europa / KPIZ
  • Project Scope:
    • Installation activities at various building of Telecom Equipment in the new Khalifa Port Industrial Zone in Taweelah