Yas Island F1 Race Track

Ruwais 4th NGL Train Instrumentation Works
Year: 2010
Location: Ruwais, Abu Dhabi, U.A.E.
Contractor/End User: Petrofac - GS Engineering Construction/GASCO

Project scope:

  • Instrumentation & Telecom works including tie-in works
  • Cathodic Protection works, as required
  • Instrumentation hook-ups
  • Testing & Pre-Commissioning
  • Assistance during Commissioning and Performance Testing
  • Supply & Installation of all materials
  • Temporary construction works
Offshore Platform

RTU/SCADA Replacement
Year: 2007
Location: Umm Shaif, Zakum(Offshore Platforms), U.A.E.
Contractor/End User: ADMA-OPCO

Project scope:

  • Engineering, Procurement, Construction & Commissioning
  • Instrumentation, Electrical and Mechanical works
  • Hot Changeover
  • DCS upgrade, RTU / SCADA / Hydraulic safety shutdown system replacement
  • Solar panels, Telemetry interface
  • Cabling
Back to Top
SCADA & Instruments Control Systems

Modernization of SCADA & Instruments/Control Systems (MOSAICS)
Year: 2007
Location: Zirku Island, U.A.E.
Contractor/End User: Honeywell / ZADCO

Project scope:

  • Electrical, Instrumentation & Civil works
  • Hot Changeover
  • SCADA, ESD, F&G, DCS upgrade
Back to Top
 Accommodation Facilities

Asab Accommodation Facilities
Year: 2007
Location: Asab, Abu Dhabi, U.A.E.
Contractor/End User: Granite / GASCO

Project scope:

  • Design, Engineering, Procurement, Construction, Installation & Commissioning of:
    • Electrical Distribution Network
    • SMATV system
    • Voice & Data Networks
  • 11 KV substations, LV power distribution, Internal and External Electrification
  • Structured cabling system
Back to Top
Yas Island F1 Race Track

Formula 1 Race Track
Year: 2008
Location: Yas Island, Abu Dhabi, U.A.E.
Contractor/End User: PKE Siemens/ALDAR

Project scope:

  • Engineering, Procurement & Construction works for all buildings
  • Installation of complete systems:
    • Lighting, small power, earthing
    • Lightning protection
    • Fire alarm systems
    • Structured cabling for all systems
Back to Top
Structured Cabling System

Habshan Non-Process Buildings
Year: 2006
Location: Habshan, U.A.E.
Contractor/End User: Granite/GASCO

Project scope:

  • Engineering, Procurement, Construction & Commissioning
  • 11 KV substations, LV power distribution, Internal and external Electrification
  • Structured cabling system
  • Fire Alarm and Gas detection system
  • Public Address System
  • PABX and related works
Back to Top
Desalination Plant

Desalination Plant Electrical Works
Year: 2008
Location: Fujairah, U.A.E.
Contractor/End User: OTV-Veolia/Fujairah Asia Power Company

Project scope:

  • Electrical works and Instrumentation Engineering works including detail design & supply for Reverse Osmosis plant
  • Supply and Installation of the following:
    • Electrical Sleeves
    • Steel Structures
    • Fire Fighting Works
    • Complete Lightning Systems for various buildings
    • Building Lighting and Small Power Works
Back to Top
Safety

Ruwais Refinery Expansion - Utilities and Offside Unit E&I Works
Year: 2010
Location: Ruwais, Abu Dhabi, U.A.E.
Contractor/End User: Samsung / TAKREER

Project scope:

  • Electrical, Instrumentation Works
  • Testing & Pre-Commissioning
  • Assistance during Commissioning and Performance Testing
  • Supply & Installation of all materials
  • Temporary construction works
Back to Top
Cabling & Power Supply Works

AGD II Construction Camp & Temporary Facilities
Year: 2006
Location: Asab, Abu Dhabi, U.A.E.
Contractor/End User: Granite / Bechtel

Project scope:

  • Electrical, Instrumentation works
  • Cabling
  • Power Supply
  • Fire alarm
  • SMATC systems
Back to Top

Step I Ethylene Plant
Year: 2001
Location: Ruwais, Abu Dhabi, U.A.E.
Contractor/End User: Alstom/Borouge

Project scope:

  • Construction
  • Commissioning
  • Public Address System
  • Fiber Optic Cables
  • Security System, CCTV
  • Telephone, Data System
Back to Top
Safety

Safety Integrity Level Study for Train I, II, III and Boilers 1-6 ESD Systems
Year: 2008
Location: Das Island, U.A.E.
Contractor/End User: ADGAS

Project scope:

  • Safety Integrity Level (SIL) study and Procurement works
  • Validation of FEED documents
  • Assessment of existing safety related instrumentation, including site survey and field verification
  • Determination of risk reduction requirements for each Safety Instrumented Function (SIF)
  • Field instruments installation and support
Back to Top
Safety

Al Wathba Waste Water Treatment Plant
Year: 2010
Location: Al Wathba, Abu Dhabi, U.A.E.
Contractor/End User: OTV-BESIX Sanotec JV / ADWEA

Project scope:

  • Electrical & Instrumentation Works
  • Testing & Pre-Commissioning
  • Assistance during Commissioning and Performance Testing
  • Supply & Installation of all materials
  • Temporary construction works
Back to Top
SAS Fields

SAS Fields E&I and Telecom Works
Year: 2010
Location: Sahil/Asab/Shah Fields, Abu Dhabi, U.A.E.
Contractor/End User: Tekfen / ADCO

Project scope:

  • Electrical, Instrumentation & Telecom works (Control Room/Substation and Field)
  • Transformers, Switchgears, VSDs, DBs, Multiport Selection Valves, DG sets
  • F&G, Alarm Systems
  • Loss prevention works, loop checking, cathodic protection works, calibration of instruments
  • Assistance during valve retrofitting, Electrical, Instrumentation and Telecom Tie-ins
Back to Top
Ruwais Refinery

Ruwais Refinery Expansion - Tankage and Piping Unit Instrumentation Works
Year: 2010
Location: Ruwais, Abu Dhabi, U.A.E.
Contractor/End User: Daewoo / TAKREER

Project scope:

  • Installation of Instrumentation Works & its related items
  • Testing & Pre-Commissioning
  • Assistance during Commissioning and Performance Testing
  • Supply & Installation of all materials
  • Temporary construction works
Back to Top
Allamah Plant

Allahamah Waste Water Treatment Plant
Year: 2010
Location: Allahamah, Al Ain, Abu Dhabi, U.A.E.
Contractor/End User: OTV - Besix Sanotec JV / ADWEA

Project scope:

  • Electrical & Instrumentation Works
  • Testing & Pre-Commissioning
  • Assistance during Commissioning and Performance Testing
  • Supply & Installation of all materials
  • Temporary construction works
Back to Top
 Power Distribution

BeAAT Central Environment Protection Facilities
Year: 2006
Location: Ruwais, Abu Dhabi, U.A.E.
Contractor/End User: SNC Lavalin / TAKREER

Project scope:

  • Procurement, Construction, Commissioning
  • Total Plant Electrical works including 11 KV substation, Power distribution, Lighting, Earthing, feed to process loads
  • Total Plant Instrumentation works including control room equipments such as PLC, Fire & Gas system, PA system etc.
  • Complete field instrumentation, cabling, hook ups and commissioning
Back to Top
Boilers Control System

Boilers Control System Upgrade
Year: 2006
Location: Das Island, Abu Dhabi, U.A.E.
Contractor/End User: ADMA-OPCO

Project scope:

  • Engineering, Procurement, Construction & Commissioning
  • Electrical, Instrumentation & Civil works
  • Changeover of control system during shutdown
  • Control System, PLC, BMS
  • Cabling works
Back to Top
Ethylene Plant

Water Injection System Upgrade
Year: 2005
Location: Asab, Abu Dhabi, U.A.E.
Contractor/End User: CAT / ADCO

Project scope:

  • Engineering, Procurement, Construction
  • Electrical & Instrumentation
  • SCADA
  • Controls systems
  • Power supply
  • Cabling works
Back to Top
Habshan Facilities

Habshan Industrial Facilities
Year: 2010
Location: Habshan, Abu Dhabi, U.A.E.
Contractor/End User: Al Fara’a / GASCO

Project scope:

  • Complete MEP works (Design, Detailed Engineering, Testing, Installation & Commissioning)
  • Electrical works
  • Telecom System for all the buildings
    • Voice & Data, PA, CCTV, Access Control System
  • HVAC
  • Plumbing & Drainage
  • Fire Fighting works
Back to Top