CAE’s qualified personnel can undertake the management and execution of emergency repairs, planned maintenance, trouble shooting, and most importantly preventive maintenance.
We have the full capability to address all your maintenance and upgrade issues in the Electrical and Instrumentation, Control systems and Telecommunication fields. With more than 33 years of experience we are keenly aware of the unique characteristics of servicing the Energy sector of the Middle East. For every project we put together a team that has vast experience in that specific field and environment.
|
|
References
|
Upgrade of Jetty Computer System
Year: 1993
Location: Ruwais, Abu Dhabi, U.A.E.
Contractor/End User: Elsag Bailey/ ADNOC |
| Project scope: |
 |
Upgrade of the whole instrumentation/control system |
 |
Erection engineering, including new cables routing, support structures design, power supply diagram, grounding diagrams, modification of existing documentation, as built drawings, etc. |
 |
Dismantling of existing control panels and installing new control panels, adapting the existing structures |
 |
Disconnection of all existing signals DCR, POV, PMCR and berths, reconnection of all aforementioned signals to new junction boxes, connection of signals to new junction boxes |
 |
Interconnection of panels, consoles, ups, etc, laying 24000m of fibre optic cables |
 |
Earthing installation, the transfer of all signals from old to new control system was carried out in hot changeover mode |
|
|
Supply, Installation, Commissioning & Maintenance of New Control System
Year: 1988-1990
Location: Asab, Abu Dhabi, U.A.E.
Contractor/End User: ADCO / ADCO
Project scope: |
 |
Detailed design, engineering and supply of the new process control system (NPCS), including software design and its implementation, technical description and philosophy of the overall NPCS |
 |
Detailed design, engineering and supply of the new ESD system, including software design and its implementation |
 |
All related engineering, purchase of all required instruments and materials, supplu and installation of a mimc panel in the new control room |
 |
Pre-assembly and FAT test of all DCS and ESD system at CAE premises |
 |
Calibration and testing of all equipment and materials, complete commissioning of the works |
 |
Hot changeover |
 |
Training of ADCO personnel |
 |
Complete check after 6 months |
 |
Maintenance -1 year |
|