Maintenance & Upgrade

CAE’s qualified personnel can undertake the management and execution of emergency repairs, planned maintenance, trouble shooting, and most importantly preventive maintenance.

We have the full capability to address all your maintenance and upgrade issues in the Electrical and Instrumentation, Control systems and Telecommunication fields. With more than 35 years of experience we are keenly aware of the unique characteristics of servicing the Energy sector of the Middle East. For every project we put together a team that has vast experience in that specific field and environment.

References

Ruwais Jetty

Upgrade of Jetty Computer System

  • Year: 1993
  • Location: Ruwais, Abu Dhabi, U.A.E.
  • Contractor/End User: Elsag Bailey / ADNOC
  • Project Scope:
    • Upgrade of the whole instrumentation/control system
    • Erection engineering, including new cables routing, support structures design, power supply diagram, grounding diagrams, modification of existing documentation, as built drawings, etc.
    • Dismantling of existing control panels and installing new control panels, adapting the existing structures
    • Disconnection of all existing signals DCR, POV, PMCR and berths, reconnection of all aforementioned signals to new junction boxes, connection of signals to new junction boxes
    • Interconnection of panels, consoles, ups, etc, laying 24000m of fibre optic cables
    • Earthing installation, the transfer of all signals from old to new control system was carried out in hot changeover mode
ADCO Asab

Supply, Installation & Commissioning of the New Control System at Asab

  • Year: 1988-1990
  • Location: Asab, Abu Dhabi, U.A.E.
  • Contractor/End User: ADCO
  • Project Scope:
    • Detailed design, engineering and supply of the new process control system (NCPS) including software design and its implementation, technical description and philosophy of operation of the overall NCPS
    • Detailed design, engineering and supply of the new ESD system including software design and its implementation
    • Perform all related engineering and purchase all required instruments and material to substitute the existing pneumatic instruments by electronic instruments
    • Preassembly and FAT test of all DCS and ESD system at CAE premises
    • Calibration and testing of all equipment and materials
    • Supply and installation of a mimic panel in the new control room
    • Supervision of civil work
    • Hot changeover
    • Complete commissioning of the works
    • Training of ADCO personnel
    • Complete check after six months
    • One year maintenance