Client: | PKE Siemens / ALDAR |
Location: | Yas Island |
Year: | 2008 |
Type: | Construction |
Scope of Work
- Major engineering, procurement, and construction works for the lighting, small power, earthing, lightning protection, and fire alarm systems for all buildings in the Formula-1 race track.
- Engineering, procurement, and construction works for all buildings.
- Installation of complete systems:
- Lighting, small power, and earthing.
- Lightning protection.
- Fire alarm.
- Structured cabling for all systems.
View Reference List
View Reference Projects