CAE has the capability to provide
Electrical & Instrumentation Engineering and Design Services in the Energy and Infrastructure sectors.
We have project managers and engineers who are experts in Conceptual Design, pre-FEED (Front End Engineering Design) and FEED. Below are some of our reference projects where project scope for CAE included engineering & design services. |
|
References
|
Implementation of SIL Study Recommendations for Train 1, 2, 3, Boilers 1-6
Year: 2008
Location: Das Island, Abu Dhabi, U.A.E.
Contractor/End User: ADGAS / ADGAS |
| Project scope: |
 |
Carry out the remaining phases of SIL study – overall life cycle as per IEC-61508 and |
 |
IEC-61511 |
 |
Basic and detailed engineering |
 |
Prepare MRQs and purchase all the materials required to complete the project |
 |
Modify existing Triconex PLC/ICS Triplex/AB system |
 |
Install digital input modules to accommodate new signals in Triconex system |
 |
Software configuration of new I/O signals in DCS and ESD system |
 |
Install field instruments and junction boxes, new S/D boxes and disconnect the existing solenoid valves |
 |
Install cables and cable glands as required |
|
|
Asab Accommodation Facilities (Phase 1)
Year: 2007
Location: Asab, Abu Dhabi, U.A.E.
Contractor/End User: Granite / GASCO
Project scope: |
 |
Existing 11 kV feeder modification |
 |
New substation design with 11 kV SWGR (ABB), transformers (4nrs 3.15 MVA), LV switch gear (areva comeca), cast resin busduct and charger (gurtor) |
 |
Design, engineering, procurement, installation and commissioning of electrical distribution network, fire and gas systems, SMATV network, voice and data networks for the following: |
|
 |
456 employee accommodation |
 |
Recreation center including kitchen, laundry, internet rooms and TV rooms |
 |
Swimming pool |
 |
Substation and chiller plant |
|
|
|
| Back to Top |
Replacement of Boilers 1 to 4 Burner Management Systems
Year: 1995-1996
Location: Das Island, Abu Dhabi, U.A.E.
Contractor/End User: ADGAS / ADGAS
Project scope: |
 |
Data collection |
 |
Design & engineering for 4 new Burner Management Systems (one for each boiler) |
 |
Procurement, supply and storage of materials |
 |
Construction and installation |
 |
Pre-commissioning, commissioning and hot changeover |
 |
Project management |
 |
Drawings, procedures, documents and manuals to ADGAS |
|
|
Supply, Installation & Commissioning of the New Control System at ASAB
Year: 1988-1990
Location: Asab, Abu Dhabi, U.A.E.
Contractor/End User: ADCO/ ADCO |
 |
Detailed design, engineering and supply of the new process control system (NCPS) including software design and its implementation, technical description and philosophy of operation of the overall NCPS |
 |
Detailed design, engineering and supply of the new ESD system including software design and its implementation |
 |
Perform all related engineering and purchase all required instruments and material to substitute the existing pneumatic instruments by electronic instruments |
 |
Preassembly and FAT test of all DCS and ESD system at CAE premises |
 |
Calibration and testing of all equipment and materials |
 |
Supply and installation of a mimic panel in the new control room |
 |
Supervision of civil work |
 |
Hot changeover |
 |
Complete commissioning of the works |
 |
Training of ADCO personnel |
 |
Complete check after six months |
 |
One year maintenance |
|
|